Original Posted By: William Young
I updated my construction log today. Some more photos of the center sectionprogress and cabanes.http://www.imagedv.com/aircamper/Log/GN1-log-003.htmI'm hoping to have the center section built and rigged within the next 2weeks.DJ VeghN74DVMesa, AZwww.imagedv.com/aircamper________________________________________________________________________________Date: Mon, 07 Jul 2003 22:57:52 -0400 (EDT)
Pietenpol-List: latest entry in web log - center section & cabanes
Re: Pietenpol-List: elevator trim systems
Original Posted By: "William Young"
I believe it is a stick tensioner rather than a true trim tab system.beyond that I don't recall the detailsDJ VeghN74DVMesa, AZwww.imagedv.com/aircamper----- Original Message -----
I believe it is a stick tensioner rather than a true trim tab system.beyond that I don't recall the detailsDJ VeghN74DVMesa, AZwww.imagedv.com/aircamper----- Original Message -----
Pietenpol-List: elevator trim systems
Original Posted By: clif
Re: Pietenpol-List: Let's get started
Original Posted By: clif